Haileybury College required a fibre optic infrastructure upgrade across three campuses for their iPad roll out
The Macmor team:
• Designed and constructed a state of the art certified OSI single mode fibre optic solution
• Retained the existing system for redundancy purposes, and completed a seamless change over for the I.T.C department
• Provided the college with the speed and bandwidth required to run iPad’s for all students and staff across the three school campuses
• Completed the crucial upgrade at all three campuses within the six week school holiday period to ensure no disruption to classes
• Delivered a certified solution with a fifteen year warranty provided to the college.